JO525bk0.book Page 15 Monday, January 27, 2003 12:29 PM
Open the wire covers on the cable-management arm by lifting the center of the wire
5
over the top of the embossed round button on the front of the forward part of the arm,
and lifting the wire over the top of a similar round button on the back part of the arm
(see Figure 1-10).
The wire cover swings open to allow cables to be routed within the arm.
F i g u r e 1 - 1 0 .
Connect the power cord to its receptacle on the back panel.
6

Routing Cables

Attach the I/O cables to their respective connectors on the system back panel.
1
For details on cable connections, see the documentation provided with the system.
If you installed the cable-management arm on the right side (as viewed from the
back), use the Velcro cable strap on the right side of the cable tray. If you installed the
cable-management arm on the left side, use the Velcro strap on the left side of the
cable tray.
Route the power and I/O cables through the right Velcro strap on the cable tray and
2
then through the cable-management arm, using four loosely secured releasable tie-
wraps (two at the forward entrance, two in the middle, and one on the back end of the
cable-management arm). Do not fully tighten the tie-wraps at this time (see
Figure 1-11).
Allow some cable slack in the cable-management arm to prevent damage to the cables.
Downloaded from
www.Manualslib.com
O p e n i n g t h e W i r e C o v e r s
manuals search engine
wire covers in
open position
Rack Installation Guide
1-15