Herunterladen Inhalt Inhalt Diese Seite drucken

Routing Cables - Dell PowerEdge 6850 Installationshandbuch

Rack
Vorschau ausblenden Andere Handbücher für PowerEdge 6850:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 58

Routing Cables

1 If applicable, install the system status-indicator cable plug into its
connector on the system back panel (see Figure 1-9).
2 Open both cable baskets on the cable-management arm by squeezing
the release latches on top of each basket.
The cable baskets swing open to enable cables to be routed within
the arms.
3 Route the system status-indicator cable along the cable-management
arm through the upper basket, and then, if desired, through the lower
basket. Insert the LED end into one of the indicator slots on the cable-
management arm (see Figure 1-9).
Dell™ Rack Installation Guide
21

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis