Operation

7.6

During operation

8

Shut-down/dismantling

8.1

Personnel qualifications

8.2

Operator responsibilities

58
Shut-down/dismantling
⇒ With double-pumping stations: The pump must be replaced after each pump-
ing operation.
⇒ Fill the pressure pipe completely with water to check the duty point. Repeat
the test run until the pressure pipe is completely full.
7. For building installation: Check all connections for impermeability.
⇒ If all connections are tight, the pumping station can be operated.
8. Fit the chamber cover and secure it against unauthorised opening.
▶ Test run completed.
▶ Pumping station is put into operation: Keep gate valve open in the pressure pipe.
▶ Pumping station in standby mode: Close the gate valve in the pressure pipe.
The pumping station operates in automatic mode by default and is switched on and off
using the integrated level control device.
Commissioning has been carried out.
Test run has been completed successfully.
The operation and functioning of the pumping station are known.
Pressure pipe completely filled with water.
1. Activate the pumping station:
- Insert the plug into the socket.
- Switchgear: Switch on the main switch.
2. Switchgear: Select automatic mode.
3. Open the gate valve in the inlet and pressure pipe.
▶ The pumping station operates in automatic mode and the pump is controlled de-
pending on the level.
ƒ
Open the gate valve in the inlet and pressure pipe!
ƒ
The maximum inflow is less than the maximum output of the unit.
ƒ
Do not remove the chamber cover!
ƒ
Ensure aeration and venting of the pump chamber!
ƒ
If the outside temperature remains below 0 °C for a prolonged period of time, there
is a risk of frost in the pump chamber if the water exchange is insufficient:
Provide insulation measures above the chamber cover.
Decommission the pump chamber.
ƒ
Electrical work: qualified electrician
Person with appropriate technical training, knowledge and experience who can
identify and prevent electrical hazards.
ƒ
Installation/dismantling work: trained specialist in plant technology for sanitary fa-
cilities
Fixation and buoyancy safeguards, connection of plastic pipes
ƒ
Ground installation (underground): trained specialist in underground and pipeline
construction
Excavate and prepare the pit, backfill the pit, buoyancy safeguards, connection of
plastic pipes.
ƒ
Lifting work: trained specialist for the operation of lifting devices
Lifting equipment, lifting gear, attachment points
ƒ
Observe locally applicable accident prevention and safety regulations of professional
and trade associations.
ƒ
Provide the necessary protective equipment and make sure that the personnel wears
it.
ƒ
Ensure enclosed spaces have sufficient ventilation.
ƒ
Take immediate countermeasures if there is a build-up of toxic or suffocating gases!
ƒ
When working in enclosed spaces, a second person must be present for safety reas-
ons.
ƒ
When using lifting equipment, observe all regulations for working with and under
suspended loads!