Factory settings:
Menü „CFG"
„S.tu"
„h.Pb"
„h.lt"
„h.dt"
„h.P.H"
„rst"
„P.rE"
„SoF"
„Lb.t"
„Lb.P"
„FA.P"
Note:
For lifting the milling equipment and the heating element, use lifting device 53410 or 53323, or a
suitable tool.
3.2.2
 Pipes smaller than the maximum welding range (diameter) of the machine, mount the
 Insert the plastic pipe or fitting in the clamping device (use dolly with longer pipe < 2,5m
 For pipe-to-pipe connections, the two spacers must be
Pipe / Fitting P160/5B:
 For pipe-to-fitting connections, the two spacers must be
 The pipe is inserted into three clamping elements, and the fitting is held by one clamping
22
Downloaded from
www.Manualslib.com
Menü „InP"
0
„Ctr"
1.0
„tYP"
0.68
„FLt"
0.17
„FLd"
100
„dP.S."
0
„Lo.S"
0
„HI.S"
0
„oFS"
0
„HI.A"
25
„Lo.L"
0
„HI.L"
The autotuning function could cause the details under "CFG" to deviate minutely. Should hunting
occur, the autotuning function can be activated while the heating plate is cold (set the menue item
"S.tu" to "2" (two) in CFG menue, the system automatically resets the parameter to "0" (zero).

Welding preparations

adapter clamping inserts suited for the pipe diameter with the Allen screws found in the
accessories kit.
ROWELD P160-355/5-12B: consisting of six wide-surface shells and two small-surface shells.
ROWELD P500-630/18-24B Plus: consisting of six wide-surface shells and two small-surface
shells (for diameters up to 450 mm) or 8 wide-surface shells (for diameters >500 mm).
In so doing, please observe that the small-surface shells are mounted to the two lower
external main clamps. These are used in the left basic clamping element below and above
only for pipe to pipe bend connections.
sections) and tighten brass nut on the upper clamps. Adjust brass nuts (tighten or loosen) to
compensate for any ovalness.
engaged in both left clamping elements (standard
configuration at delivery).
Attention: Under no circumstances should the spacers be
installed diagonally offset!
The pipes are each held by two clamping elements.
engaged in both middle clamping elements.
Attention: Under no circumstances should the spacers be
installed diagonally offset!
element. Thus, the movable clamping element can be shifted on the rod as space
requirements demand during clamping.
manuals search engine
Menü „Out"
8
„AL.n"
0
16
„r.o.1"
0
0.1
„r.o.2"
0
0.5
„Ct.1"
20
0
„Ct.2"
20
0
„rEL."
0
300
xx
0
0
280
ENGLISH
Menü „PAS"
„Prot"
32

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis