Herunterladen Inhalt Inhalt Diese Seite drucken

BestWater 66-11 Gebrauchsanweisung Seite 60

Jungbrunnen
Vorschau ausblenden Andere Handbücher für 66-11:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Initial commissioning
If the commissioning has been com-
pleted and the withdrawal tap is open,
the program automatically changes
over to permeate production.
Digital X-Pro 20b Controller
Permeat production
device in
operation
ESC < -
A
B
We recommend to allow the permeate
to drain the first 7 - 10 minutes after
commissioning, in order to flush out
any remaining disinfectant residues.
After the commissioning, you can use
the system normally.
During the initial commissioning,
please check all hoses for their
position and their leakage tight-
ness. The hoses must not be bent
or damaged!
60
Downloaded from
www.Manualslib.com
ESC
-
+
OK
manuals search engine
Remove water from the
Jungbrunnen 66-10 and
66-11.
1. Open the withdrawal tap. For this
purpose, the rocker arm is rotated
from the vertical position to the side.
Should the system be in the Standby
mode for longer than 15 min., you
will get the drinking water only after
approx. 15 - 30 sec. During this time,
the system prepares for the water
production.
The following messages are displayed
on the display:
Digital X-Pro 20b Controller
Permeat production
membran rinse
ESC < - 00080%
A
B
ESC
-
+
OK

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für BestWater 66-11

Diese Anleitung auch für:

66-10

Inhaltsverzeichnis