rear and shorten to the right length once installed) Adjust
the top roller on the motor side as shown in illustration
Lock the roller in place on the bar with a screwdriver
Carefully twist the outer ring in the direction of the arrow
then pull the ring out and off.
[1.70c
]
R/L
Mounting finger protection:
(29)
Applies to all designs and types:
Gently insert the finger protection 20 into the area shown
.
[1.70b]
(30)
Adjusting the upper roller:
(30a) Manual and NovoPort operation:The centre of the
roller should enter approx. 5 mm into the moulded
end piece 16
(30b) Ceiling pull operation:The roller must be in the upper
radius of the moulded end piece 16
OPTIONAL
If frames or panel seals are misshapen, they can be restored to
their original shape with, e.g., a hot air gun.
Caution: Do not overheat seals!
Keep these installation, operating, and maintenance instructions in a safe place during the entire service life of the garage door!
.
[1.70d, da]
R/L
[1.70d, da]
R/L
.
[1.60]
Inspection instructions
.
[1.70c]
.
[1.70c
]
R/L
All parts must be assembled as described in the installation
instructions to assure the functional reliability, durability and
smooth operation of the sectional door. If the sectional door still
does not function properly, please check the following points:
(31)
Are the side angular frames, frame panel and horizontal
track pairs exactly aligned horizontally, vertically and
diagonally, and securely fastened?
(32)
Are all screw connections tight?
(33)
Have the transitions between the vertical tracks in the
angular frame and the 89° arc been adjusted (see section 7)?
(34)
Check the spring tension: Open the door halfway. The door
must hold in this position without help.
.
(35)
If the door sinks noticeably, increase the spring tension as
described in section 23.
If the door rises noticeably, lower the spring tension as
(36)
described in section 23.
(37)
Are the spring pins inserted in the lower spring mounts and
in the tightening strap?
(38)
Roller: Can all the rollers be easily turned by hand when the
door is closed (see sections 17+28)?
Has the upper roller been correctly adjusted (cf. Sections
(39)
30a,b)?
(40)
When the door is open, do all roller axes extend by the
same distance out of their holders?  Diagonal testing
(41)
Are the double cables positioned exactly in their guides, and
are not twisted?
(42)
Doors with operators: Has the locking mechanism been
dismantled?
(43)
Doors with NovoPort: Check the clearance opposite the
operator between the door panel and the guide! Bend the
contact surface.
Dismantling instructions for sectional doors
iso70-1 with vertical tension spring
- Dismantling by qualified installers only -
Please
read
dismantling
The following tools are required for dismantling:
SW 7, 10 and 13 open-end or socket wrench, reversible ratchet
with extension and SW 7, 10 and 13 spanners, Phillips
screwdriver size 2, T30 screwdriver bit, at least 2 screw clamps,
possibly a hammer.
Removing the tension springs
(44)
Caution: Wear suitable personal protective equipment
when removing the tension springs and secure the door
panel to prevent it from falling down!
Move the door panel to its open end position and secure it
to prevent it from falling down. Remove the single cables
from the lower cable link on the left and right sides.
(45)
Close the door slowly and carefully.
(46)
Beginning with the top section, dismantle each section in the
reverse sequence to installation.
(47)
Continue dismantling the door in reverse order as described
in the installation instructions.
- 10 -
[1.30 Diagonal measurement]
these
instructions
carefully
prior