Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 93
Installation Module C)

WATER CONNECTIONS

No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
INSTRUCTIONS BELOW:
Let each group dispense water for about a minute.
Continuously dispense hot water (pressing the appropriate button) until at least 6 liters of water have been used for a
machine with 2 groups and 9 liters for a machine with 3 groups (see the "Cleaning and Maintenance" Chapter in the User's
Manual).
(also with Autosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
5 EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis