Herunterladen Inhalt Inhalt Diese Seite drucken

Positioning; Setting Up; Controls - Laranzato GREEN Serie Gebrauch Und Instandhaltung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 56

6.3. Positioning

●Place the machine on the horizontal sur-
face previously prepared.
Before connecting, thoroughly wash the mains water
pipes:
● Leave the water supply taps running at full pres-
sure for several minutes.
● Connect to the mains water supply.
● Connect the machine to the socket.
● Connect the gas pipe
Thoroughly wash all the water pipes of the machine:
● Leave the water supply taps running at full pres-
sure.
● Switch on main switch (pos.1 - Fig.7): wait until
the boiler fills up to the level set. (mod.CLUB
switch
)
● Switch on main switch (pos.2 - Fig.7) to begin
heating the water in the boiler. (mod.CLUB
switch
)
● Operate each unit in order to allow the water to
escape for about one minute; repeat the operation
twice.
● Deliver steam from the steam jets for about one
minute.
● Deliver hot water for about one minute; repeat the
operation twice.
● Switch off main switch.
● Empty the water from the boiler: see point 10.3
IMPORTANT
Should the machine not deliver water for over
24 hours, wash the internal components be-
fore beginning work, repeating the operations
as described above

7. SETTING UP

7.1. Controls (Fig.7)
1 Main switch.
Three-position switch:
0 off;
1 activates the pump to fill the boiler;
2 turns on the whole machine and activates the
heating elements.
1A Two-position switch with led.
Turn on the switch, led on, the machine is turned
(apart from the boiler) and the pump is turned on
to fill the boiler;
1B Boiler resistance switch.
Two-position switch with led.
On activating the switch, the led comes on, and
power is supplied to the resistance for the boiler
water.
84
2 Green pilot lamp.
When on, indicates that machine is powered (main
switch on).
3 Coffee dispensing switch.
Two-position switch with led (mod. PU):
turn on the switch, led on, coffe is dispensed;
turn off the switch, led off, dispensing of coffee is
interrupted.
4 Electronic coffee delivery button panel.
6 buttons with relative led (mod.ME):
A Press the button, the led of the selected button
will remain on and the leds of the other buttons
will switch off, the dispensing of one strong coffee
will start.
The leds will switch on again at the end of the
dispensing.
B Press the button, the led of the selected button
will remain on and the leds of the other buttons
will switch off, the dispensing of one long coffee
will start.
The leds will switch on again at the end of the
dispensing
C Press the button, the led of the selected button
will remain on and the leds of the other buttons
will switch off, the dispensing of two strong coffees
from the same group will start.
The leds will switch on again at the end of the
dispensing
D Press the button, the led of the selected button
will remain on and the leds of the other buttons
will switch off, the dispensing of two long coffees
from the same group will start.
The leds will switch on again at the end of the
dispensing
E Press the button to stop the dispensing under
way.
To stop a dispensing under way started with A-B-
C-D- buttons, press the same button activated or
button E STOP
5 Hot water supply handwheel (mod. PU).
Tap: turn a antclockwise to open and clockwise
to close.
6 Dose of hot water supply switch (mod. ME).
Press the button to obtain the delivery of a dose
of hot water.
7 Steam supply handwheel.
Tap: turn in an anticlockwise direction to open and
clockwise to close.
8 Orange pilot lamp (mod. CLUB PU/S-ME/S).
When on indicates a lack of water in the tank and
consequent stop of machine.
9 Manual filling button.
Press down to fill the boiler.
10 Valved gas power tap (models with gas hea-
ting).
Open: vertical position;
Closed: turn 90° in clockwise direction.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis