Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly - cecotec CONGA 1490 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für CONGA 1490:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 49
ENGLISH

3. ASSEMBLY

3
Wet & dry tank installation
4.
Open the water-filling opening, fill
the tank with water and close it again
following the arrows on the picture.
5.
Completely dry the connecting plates.
6.
Introduce the
compartment and lower the handle.
7.
Introduce the Wet&dry tank (water and
dust) into the product's main body.
24
2
Main brush and mops installation
1.
1
body.
2. Install the main brush cover.
3. Adjust the mop to the tank's bottom part
and press with your hand to make sure it is well
attached.
dust tank into the
Install the main brush into the robot's main
6
7
4
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis