Herunterladen Inhalt Inhalt Diese Seite drucken

Assembling The Pcr Workstation - VWR PCR HEPA Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

If the instrument has just been unpacked or has been stored in a cold environment, it should
be allowed to come to room temperature for 2 – 3 hours in the laboratory before switching on.
This will prevent calibration failure because of internal condensation
The instrument must be connected to the power supply with the power cord supplied.
It is recommended that users should thoroughly read this manual prior to use
Contact your supplier if you experience any difficulties with this instrument

ASSEMBLING THE PCR WORKSTATION

The PCR Workstation should be assembled by two people, directly at the site of operation. We
recommend the wearing of safety gloves for hand protection.
Step 1
Put the base 1 on an even surface with the
rubber feet facing down and the sensor
cable outlet facing to the front. Lay the back
panel 2 onto the base 1 with the power
outlets facing down, and the power input
and the type label facing to the right.
Connect both sensor cables.
Slide the connection assembly into the
cavity of the back panel.
VWR Collection PCR Workstation HEPA
Base 1
7
Back panel 2

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis