Herunterladen Inhalt Inhalt Diese Seite drucken

Connect The Control Cables - ABB ACQ580-01 Kurzanleitung Für Die Installation

Frames r0 to r5
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 107
24

Connect the control cables

See figure
R0...R4 Figures H
signal cable and one digital signal cable. Make the connections according to the
default configuration in use. The default connections of the Water default
configuration are shown in section
R0-
R4
1. Remove the front cover, if not already removed. See section
R5
and open the cover
Example of connecting an analog signal cable:
R6-
R9
2. Cut an adequate hole into the rubber grommet and slide the grommet onto the
cable. Slide the cable through a hole of the bottom plate and attach the grommet
to the hole.
3. Ground the outer shield of the cable 360 degrees under the grounding clamp.
EN
Keep the cable unstripped as close to the terminals of the control board as
possible. Ground also the pair-cable shields and grounding wire at the SCR1
DE
terminal.
ES
4. Route the cable as shown in the figure.
5. Connect the conductors to the appropriate terminals of the control board and
FR
tighten to 0.5...0.6 N·m (0.4 lbf·ft).
IT
6. Tie all control cables to the provided cable tie mounts.
RU
SV
on page 91. It shows an example with one analog
Default I/O connections
on page 19.
on page 25.
Switch off the power

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis