11. Commissioning

11.1 Initial start-up

» Fill the appliance by running the tap several times
until the pipework and appliance are free of air.
» Carry out a tightness check.
» Insert the power cable plug, if present, into the
standard safety socket or set the fuse/MCB.
» Check the function of the appliance.
» In the case of oversink installation, affix the company
logo supplied over the existing company logo.

11.2 Appliance handover

» Explain the appliance function to users and familiar-
ise them with its operation.
» Make users aware of potential dangers, especially
the risk of scalding.
» Hand over these instructions.
11.3 Recommissioning
Material losses
!
Following an interruption of the water supply, recom-
mission the appliance by carrying out the following
steps, in order to prevent irreparable damage to the
bare wire heating system.
» Isolate the appliance from the power supply. Pull the
power cable plug, if present, from the socket, or re-
move the fuse/reset the MCB.
» See chapter "Initial start-up".
11.4 Settings
You can alter the maximum flow rate and temperature.
DANGER Electrocution
The flow rate and temperature may only be adjusted
if the appliance is isolated from the power supply.
» Isolate all poles of the appliance from the power
supply.
DANGER Electrocution
The adjusting screw for changing the flow rate and
the potentiometer for setting the temperature are
live if the appliance has not been isolated from the
power supply.