Herunterladen Inhalt Inhalt Diese Seite drucken

Related Documentation - Bergstrom INTEGRAL POWER II Montageanweisungen

Vorschau ausblenden Andere Handbücher für INTEGRAL POWER II:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 26
INTEGRAL POWER II
EN
Assembly
Recommendations
• Before starting assembly, please read instructions and
follow them during installation process.
• Use the adequate tools for each operation.
Electricity
• Disconnect ignition key.
• Disconnect battery before starting assembly.
• Make sure electric components are securely connected,
checking their correct fitting.
Warning
!
Any modification to ROPS/FOPS, such as welding or
drilling holes in the structural members for mounting
brackets, will affect the ROPS/FOPS capability to provide
the required protection. Installing this product may affect
ROPS/FOPS systems.
Contact your authorized dealer to check compatibility
before making any modifications or repairs. Failure
to do so may void the ROPS/FOPS certification. The
manufacturer of the roof air conditioner assumes no
liability whatsoever.
Warning
!
When installing air conditioning equipment on roof, the
upper cabin part must be protected with a cloth or a
protective blanket to avoid possible scratches. When
installing Integral Power II on roof, take into account
that, normally, cabins equipped with a hatch have a
strong enough structure to hold equipment weight.
However, if it is not the case and it is necessary to
carry out a cut in the roof or, although it has a hatch, the
material is not resistant enough (if roof is made of fibre,
plastic, etc...), it is the installer who will have to decide,
under his responsibility, if it is necessary to reinforce
the roof to avoid possible deformations, breaks, water
entries, etc., habilitating the means required to stop it
from occurring.
Set of Torx keys
Set of Allen keys
Ø10 Spanner
Scissors
Flexometer
Ø10 Wrench
Phillips screwdriver / screwdriver
Ø35 Circular saw
Ø7 Drill
Sabre saw

Related documentation

Mounting instructions
User's guide
Troubleshooting
Parts list
Documentation included
Warranty
!
The installing personnel must have a sufficient training
in vehicles air conditioning.
!
Bergstrom shall not be responsible for breakdowns
or damages coming from an inadequate handling or
installation of the equipment or from modifications
and substitutions carried out without our express
and written authorisation.
!
Unit pre-loaded with refrigerant gas R-134a, (Do not
touch the refrigerant gas circuit).
!
Please see product warranty procedure included in
Troubleshooting.
!
Please see equipment User's Guide for its correct
functioning of the remote control and control panel.
!
Once installation is finished, the following documents
must be handed over to the user: User's Guide,
Warranty and Troubleshooting.
10
Tools
1002347703
1002185994
1002186001
1002347704
220AA10010
Warnings
!

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis