Herunterladen Inhalt Inhalt Diese Seite drucken

Bergstrom INTEGRAL POWER II Montageanweisungen Seite 15

Vorschau ausblenden Andere Handbücher für INTEGRAL POWER II:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 26
INTEGRAL POWER II
Position Ø9 x Ø13 PVC pipes, as supplied, in
6B
the unit in accordance with required length.
Caution: Position drainage valves at the end
!
of the PVC pipes for the water to run off.
Connection to alternator cable for unit operation with
Caution: The cable will be installed in all
!
vehicles for the unit to work with the engine
started up.
Position excitation cable on the inside or
7
outside of the vehicle as appropriate, and
secure the front with the supplied self-tapping
screws. Connect switches as shown.
Air speed
switch
7
the engine running
A/C switch
on the inside
15
7
EN
C
Drain valve
on the outside

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis