Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connections - CAME Z Serie Installationsanleitung

Schalttafel für getriebemotoren mit 230 v
Vorschau ausblenden Andere Handbücher für Z Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 32
5.3 Fixing and mounting the casing
1) Fix the base of the panel in a protected area; we suggest using
round top Phillips recessed head screws of max. 6mm in diameter.
3) After the adjustments and settings, fix the cover using the provided screws.

6 Electrical connections

Gearmotor
Gearmotor featuring delayed action
on opening (M1)
FERNI
FROG
M1
When using only one motor (e.g. on one leaf gates), connect it up on W X Y (M2) regardless of
which side it is installed on – (fro FROG, if need be, invert connections X and Y).
FAST
ATI
KRONO
U V W X Y E1
Standard opening setup scheme in Came gearmotors.
2) Perforate the pre-punched holes and insert the cable glands with the
corrugated tubing for the electrical cables to travel through.
N.B.: the pre-punched holes have the following diameters: 23, 29 e 37 mm.
Be careful not to damage the control board inside the control panel!!
FERNI
Gearmotor featuring delayed action
on closing (M2)
FAST
KRONO
FROG
M2
ATI

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Za4n

Inhaltsverzeichnis