Herunterladen Inhalt Inhalt Diese Seite drucken

Operating Function With Gpl Electrical Connection - elco CB-P2.170 G-U/TCG KN Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Assembly
Operating function with GPL
Electrical connection
A
A
1
4
3
Sez. A-A
LPG TRANSFORMATION
KITLPG-P...
For operation with Lique fied Petroleum
Gas, it is necessary to order the kit and
follow the instructions given in the
specific manual.
Electrical connection
Electrical installation and connection work
must only be carried out by a suitably
qualified electrician. All applicable
regulations and directives must be observed.
• Check to ensure that the power supply
is as specified (230V, 50 Hz single
phase with neutral and earth).
• Boiler fuse: 10A.
The burner and heat generator (boiler) are
connected by a 7-pin connector 1.
05/2014 - Art. Nr. 420010540302
Position of electrodes
Setting the ionisation probe and
ignition electrode: see diagram.
Always check the position of the
electrodes after service or substitution
or assembly of LPG kit as wrong position
might cause ignition problem.
Connecting the gas train
Connect the gas train to the plugs on the
burner (black to black, grey to grey).
en
75

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cb-p2.170 g-u/tcg klCb-p2.170 g-u/tcg/tc knCb-p2.250 g-u/tcg knCb-p2.250 g-u/tcg klCb-p2.250 g-u/tcg/tc knCb-p2.250 g-u/tcg/tc kl

Inhaltsverzeichnis