Herunterladen Inhalt Inhalt Diese Seite drucken

Quick Start With Continuous Motor Operation; Quick Start With Longer Preventilation - elco CB-P2.170 G-U/TCG KN Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Quick start with
continuous motor
operation
Functional sequence phases:
1 : No voltage.
2 : Power supply on, no heat request.
3 : Heat request, check air pressure switch idle
position.
4 : Motor on, check air pressure
9 : Preventilation.
9' : Pre-ignition, activation of
Quick start with
longer
preventilation
Functional sequence phases :
0 : No voltage.
1 : Power supply on, no heat request,
check air pressure switch idle position.
1' : Heat request
2 : Motor on, check air pressure.
3 : First phase sealing test (valve space
depressurised).
70
unauthorised flame monitoring.
10 : Flame formation, safety period
11 : Post-ignition time
12 : Operation
13 : Burner stop
14 : Postventilation
14': Continuous motor operation
4 : Test time 1
5 : Valve check second phase (valve space filled)
6 : Test time 2
7 : End of postventilation
8 : Standby
9 : Preventilation
9' : Preventilation/unauthorised flame
monitoring/pre-ignition.
05/2014 - Art. Nr. 420010540302
10 : Formation de la flamme, temps de sécurité
11 : Post-ignition time
12 : Operation
13 : Burner stop

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cb-p2.170 g-u/tcg klCb-p2.170 g-u/tcg/tc knCb-p2.250 g-u/tcg knCb-p2.250 g-u/tcg klCb-p2.250 g-u/tcg/tc knCb-p2.250 g-u/tcg/tc kl

Inhaltsverzeichnis