Herunterladen Inhalt Inhalt Diese Seite drucken

Priority Control; Power Supply - Finished Walls - AEG DDLE ÖKO TD 27 Bedienung Und Installation

Vollelektronisch geregelter komfort-durchlauferhitzer
Vorschau ausblenden Andere Handbücher für DDLE ÖKO TD 27:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation
9.3 Installation versions
9.3.1 Power supply – unfinished walls - from below
5
1
» Push the cable grommet over the power cable (1).
» Break out the cable grommet knock-out in the back
panel (2).
» Reposition the mains terminal from the top to the
bottom. For this, undo the screw and refit the mains
terminal to the bottom; then retighten the mains ter-
minal (3).
» Push the back panel over the threaded stud and the
cable grommet. Pull the cable grommet at the tabs
into the back panel using pliers, until both locking
hooks click audibly into place (4).
» Push the back panel firmly and flush against the wall
and lock with the fixing toggle (5).
9.3.2 Power supply – finished walls
» Cut a cable entry point into the back panel for the
power cable or break out the appropriate knock-out.
b04
b02 Entry electrical cables I
b03 Entry electrical cables II
b04 Entry electrical cables III
34
3
4
2
b04
35
b02
b03
40
b04
Note
This type of connection changes the IP rating of the
appliance.
» Change the type plate. Cross out "IP 25" and
mark the box "IP 24". Use a ballpoint pen to do
this.

9.3.3 Priority control

When used in conjunction with other electrical appliances,
e.g. electric storage heaters, the load shedding relay can
be used. The load shedding relay LR 1-A must be installed
in the electric distribution board on a top-hat rail.
LR 1-A
3
2
1
1 Load shedding relay (see Special accessories).
2 Control cable to the contactor of the second appli-
ance (e.g. electric storage heater).
3 Control contact, opens when switching the instanta-
neous water heater ON.
The relay responds when the instantaneous water heater
starts.
Only connect the load shedding relay to the central phase
of the mains terminal.
9.3.4 Undersink installation, water connections –
from above
You can carry out undersink installation with water con-
nections from above with the additional pipe assembly
for undersink appliances. For this, cleanly break out the
apertures for the water pipes in the back panel and fit the
pipe assembly.
9.3.5 Tap for finished walls
The pressure tap for finished walls is offered as special
accessory; see chapter Special accessories. For instal-
lation, carry out the following steps:
» Fit the water plugs G ½ with gaskets to the appliance
water connections. The plugs are part of the stand-
ard delivery of the tap.
» Install the tap.
» Push the free ends of the pipes into the valve.
» Click the lower back panel section into place in the
upper section of the back panel.
» Secure the connection pipes to the appliance.
» Secure the back panel at the bottom with two addi-
tional screws (24).
» Cleanly break out the entries in the appliance cover
(1). If necessary, use a file.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ddle öko td 18/21/24Ddle öko td 18

Inhaltsverzeichnis