2.4.3
Provision of shear connectors
The shear connectors are not included in the scope of
delivery and must be provided by the user.
Recommended shear connectors:
Specifications
Qty.
Type
Connector length
Base material thickness min.
Drill hole depth min.
Anchoring depth
Drill bit
Tightening torque
Connector length
The shear connector must reach into the blinding
concrete. The connector length is to be selected in
accordance with the floor structure over the blinding
concrete.
Fig. 4:
Calculation of connector length
L Connector length
g
Visible thread length
t
Thickness of base plate of lifting platform column
s
Thickness of screed including tiles
h Anchoring depth (as specified by connector manufacturer)
B Concrete thickness (refer to Section 2.4.2)
The anchoring depth h and the drill hole depth h+s are
specified by the connector manufacturer. This results in
a connector length of at least L = h + s + t + g.
i
Use can also be made of other makes provided that
these have been approved by the supervisory author-
ities for use on the compression and tension side of
the concrete. The tensile strength of the connector
must be at least 55 kN. Attention is to be paid to the
fitting instructions of the connector manufacturer.
!
The type of connector used must be recorded in the
test log book.
2.4.4
Routing of electrical connection
Routing of the wiring to the installation location.
!
The user must provide fuse protection for the electri-
cal connection.
Robert Bosch GmbH
Designation, value
10 x
Hilti HVA/HAS-M16x125
Refer to Fig. 4
210 mm
125 mm
125 mm
dia. 18 mm
80 Nm
Installation | VLH 2140 | 27
3.
Installation
3.1

Hazard warnings

DANGER – Incorrect installation of lifting
platform
Risk of (fatal) injury due to the vehicle falling
or tipping up during lifting, when working on
the vehicle and on lowering.
Erection is only to be performed by Bosch
customer service or authorized service
agents on the basis of these installation
instructions.
Installation is only to be performed if all the
prerequisites are satisfied and the scope of
delivery is complete.
3.2
Unpacking lifting platform
3.2.1
Determining location
1. Determine the location of the control column (col-
umn with operating unit) and of the secondary
column.
i
The control column is located on the right when
viewed in the direction of travel.
!
A safety clearance of at least 1 meter must be main-
tained in front of and behind the vehicle as well as to
the sides of the lifting platform.
2. Perform trial drilling in the foundation.
!
Successful, positive trial drilling in the foundation is
a prerequisite for installation.