32 | VLH 2140 | Installation
3.5
Installing functional groups
3.5.1
Installing synchronizing cables
1. Lay the synchronizing cables on the basis of the
cable routing diagram.
Fig. 16:
Cable routing diagram
1 Upper pulleys
2 Steel cable
3 Lower pulley
4 End pieces for attachment to lifting carriage
2. Use safety nuts to attach the end pieces of the
synchronizing cables to the lifting carriage.
!
Use an open-ended wrench to provide support for
the end pieces and then turn the safety nuts using
a socket wrench and a ratchet.
!
Adjust the end pieces such that both lifting carriages
are at the same height.
3. Screw in the safety nuts further until both steel
cables are sufficiently taut.
i
Check for correct cable tension:
Pull the steel cable as firmly as possible by hand
in transverse direction. The deflection should be
approx. 10 cm.
|
1 689 978 569
2017-08-02
Fig. 17:
Securing lifting carriage
1 Safety nut
2 End piece (long, from bottom)
3 End piece (short, from top)
4 Steel cable
5 Lifting carriage
4. Fit the pulley guard plates.
$
One angled guard plate at the top of each lifting
column.
$
One U-shaped guard plate at the bottom of each
lifting column.
Fig. 18:
Fitting guard plates
1 Guard plate for upper pair of pulleys
2 Guard plate for lower pulley
i
The guard plate stops the steel cable slipping off the
pulley even in the event of a temporary loss of cable
tension (example: contact with an obstacle).