Herunterladen Inhalt Inhalt Diese Seite drucken

Water Connections; Defrost Water Drainage (Syscroll Air Hp Only); Water Buffer Tank - SystemAir SYSCROLL Air CO series Installations- Und Wartungshandbuch

Luftgekühlte flüssigkeitskühler und wärmepumpen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 91
Before filling the installation, remove any
impurity, such as sand, crushed stones and
welding scales, coating drops and any other
material which might damage the evaporator.
WARNING
It is advisable to flush with disposable water bypassing the exchanger
to avoid clogging.
The water used to fill the circuit shall be treated
in such as way that the pH will have the correct
value.
NOTE
When two or several units are connected in parallel, to balance the
load losses of the various circuits, it is recommended to execute a
"reverse return" connection (see the diagram below).
UNIT 1
UNIT 2
Legend
S
On/Off valves
VG
Balancing valves

4.3 Water connections

The flow switch and the filter water, although not included in the
supply, must always be fitted such as plant components.
Their installation is mandatory for warranty.
The attachments at the water inlet and outlet
shall be connected in compliance with the
instructions which can be found on the labels in
the proximity of the attachments.
WARNING
Connect the water lines of the plants with the attachments of the unit
whose diameters and positions are shown in Chapter 9.
4.4
Defrost water drainage
(only for SYSCROLL Air HP units)
When SYSCROLL Air HP heat pump units work in heating mode,
during defrosting cycles, they may discharge water from the base.
This is why the units should be installed at least 200 mm above the
floor level, so as to allow the free drainage of waste water, without the
risk of producing ice banks.
4 - Installation
The SYSCROLL Air HP heat pump units must be installed in positions
where the defrosting water cannot create any damage.

4.5 Water buffer tank

The accumulation tank which has been designed to be mounted
on SYSCROLL Air HP units is complete with all the hydraulic and
electrical components required for the correct operation of the
system.
These systems are carefully assembled and tested at works. They
are ready for operation after having correctly realised all electrical
and hydraulic connections.
4.5.1 Features
The kit will include an Antifreeze Electric Heater, a drain valve, an
automatic filling unit and an automatic air vent.
No pump is arranged on the kit since it is mounted on the unit.
A tank arranged for mounting a heating booster resistance kit may be
optionally required (5 traps).
The tank is completely insulated with 30 Kg/m
polyethylene in a silver colour and enclosed by a bearing structure
made of passivated and painted plates. The box is equipped with
bulkheads which can be easily opened for internal inspection.
The kit is installed beneath the chiller. It is an integral part of the unit
without changing the support area.
4.5.2 Supplied Material
The kits will be supplied with pipelines ready for installation. An
antifreeze resistance with wiring, an automatic water filling valve, a
3 bar safety valve, a drain valve and a vent valve have already been
assembled.
Hydrokit is shipped with a film to protect it from atmospheric agents.
Packaging has been designed in order to stack it up.
4.5.3 Antifreeze Electric Heater
The antifreeze resistance of the tank (TEH) shall be wired with the
panel as it is shown by the diagram attached to the unit.
4.5.4 Water Filter
The kit will use the water filter of the unit.
16
closed cell
3

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Syscroll 30 air coSyscroll 35 air coSyscroll 20 air hpSyscroll 25 air hpSyscroll 30 air hpSyscroll 35 air hp ... Alle anzeigen

Inhaltsverzeichnis