Herunterladen Inhalt Inhalt Diese Seite drucken

Transport; Electrical Connection; Set Up/Installation - Conel FLOWBOX-N Montage- Und Betriebsanleitung

Hebeanlage für schmutzwasser
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
6.

Transport

ATTENTION!
The lifting unit must not be thrown or dropped during transport or installation.
The lifting unit must not be lifted by the power cable!
7.

Electrical connection

/
Observe the correct operating voltage (see "Technical Data").
/
Never place the power plug in water.
/
Connect the lifting unit to a properly installed electrical socket (in compliance with the power
supply company regulations) protected by at least a 10 A (slow-blowing) fuse.
/
For units of protection classification I, all exposed conductive parts are connected with a protective
earth conductor. Before the unit is put into operation, an electrically skilled person must check that
the protective earth cable is properly connected.
/
Temperatures higher than those permitted cause the pump to be shut off by the temperature
limiter. After the temperature limiter is triggered, disconnect the pump from the electric system
before correcting the cause of the fault, otherwise it will switch on automatically once cooled down.
8.

Set up/installation

ATTENTION!
The relevant standards must be observed.
For use below the backwash level:
/
Guide the discharge line with a loop above the backwash level.
/
If the base of the discharge line loop is more than 5 m above the lifting unit, an additional
checkvalve must be installed.
/
Provide shut off valves.
/
Every drain must be fitted with an odour trap.
Also see installation examples (page 39, figure 3).
33

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis