Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Application Guidelines - Siemens SITRANS F FUS1020 IP65 NEMA 4 Schnellstart

Durchflussmessgeräte
Vorschau ausblenden Andere Handbücher für SITRANS F FUS1020 IP65 NEMA 4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

2.1

Application Guidelines

Basic Requirements
● Determine pipe material and dimensions.
● Avoid vertical pipes flowing in a downward direction.
● Avoid installation of transducers on the top and bottom of horizontal pipes, if possible.
● Select a location with the longest straight run of pipe.
● Identify upstream piping configuration (elbow, reducer, etc.).
● Pipe surface should be smooth and, if necessary, free of paint.
● Avoid pressure reduction components upstream.
● Avoid mounting on or near weld seams.
Additonal Requirements for Liquid Applications
● Pipe must be full during set-up.
Additonal Requirements for Gas Applications
● Pipe must be fully pressurized during set-up.
SITRANS FUS1020 IP65 NEMA 4 Quick Start
Operating Instructions (Compact), 4/2009, CQO:QSG006 Revision B
2
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis