Herunterladen Inhalt Inhalt Diese Seite drucken

Transporting On A Trailer; Slinging And Jacking The Machine - Ransomes Parkway 3 Sicherheits-, Bedienungs- Und Wartungshandbuch

Aufsitzzylindermäher
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7
OPERATION

7.12 TRANSPORTING ON A TRAILER ________________________________________

The machine is fitted with tie-down loops front (A) on hard point and rear (B). Always tie down the machine
securely to the trailer.
Always follow any recommendations for maximum trailer weights given in your towing vehicles handbook.
Do Not exceed the maximum gross weight shown on the trailer plate.
Always read the trailer manufactures and towing vehicle manufactures handbooks before towing.
A
B

7.13 SLINGING AND JACKING THE MACHINE _________________________________

Slinging
When slinging the machine a set of four damage free wheel clamps must
be used, similar to the one shown, in conjunction with a certified lifting
frame. For more information go to www.tipnlift.co.uk.
Jacking
The machine has four jacking points indicated, two on the rear axle and two
on the front axle.
en-52

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Highway 3Lgea340Lgea320

Inhaltsverzeichnis