Herunterladen Inhalt Inhalt Diese Seite drucken

Tripp Lite SmartOnline SUINT1000LCD2U Bedienungsanleitung Seite 18

Einphasen-online-usv-systeme mit integriertem lcd-überwachungs- und steuerbildschirm zur rack-montage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 105
Operations
2
The LCD screen will display the present configuration settings. Press NEXT
configuration.
3
Then select CONFIGURE VIA UPS and press NEXT
4
The LCD screen will prompt you to move to the next screen where
the SMART and NON-SMART battery packs can be configured.
Then select NEXT
...
Note: The display will cycle between two screens to show all the text.
5
The LCD screen will display the list of supported external battery packs preceded by a column
displaying the number of configured SMART and NON-SMART external battery packs. SMART
BATTERY PACKS detected via the BP DETECTION PORT will already be listed with the appropriate
quantity of 1-6 under the "S" Column of this screen.
To configure NON-SMART batteries and any SMART batteries beyond the 6 that were auto-detected,
use the UP/DOWN
and NEXT
press BACK
to edit your entry or APPLY
ESC
Note: The "S" column displays the number of configured SMART battery packs and the "N" column displays the number of
configured NON-SMART battery packs.
Note: Pressing the UP or DOWN buttons change the "N" column value. Pressing the NEXT button moves the cursor down one
row.
Note: When you reach the last row, NEXT will change to APPLY.
6
After the manually entered NON-SMART battery packs have been
applied to the UPS, the LCD will report that the change has been
accepted and will suggest you verify that the actual set of external
battery packs match the UPS configuration.
Press NEXT
to move to the next screen
7
The LCD screen will ask you to press NEXT
configured external battery packs.
The following screen allows you to pick the current date for installation, or allow you to enter an
installation date in the past, in case the BP was added at a previous date.
.
buttons. After the last battery pack on the list is configured,
to enter the new values.
.
to enter the battery installation date for manually
18
to edit the
Configure via UPS
Configure via UPS
Press NEXT to view
Press NEXT to view
detected SMART BPs
detected SMART BPs
(S column) and
(S column) and
specify NONSMART
specify NONSMART
BP qty (N column).
BP qty (N column).
Back
Back
Next
Next
SETUP
SETUP
ESC
ESC
Configure via UPS
Configure via UPS
Change accepted. For
Change accepted. For
true capacity and
true capacity and
runtime reporting,
runtime reporting,
verify connected BPs
verify connected BPs
match configuration
match configuration
Back
Back
Next
Next
SETUP
SETUP
ESC
ESC
External Batt
Note Presently
configured via UPS
on 04/07/2014
Press Next to change
Back
Next
SETUP
External Batt
ESC
Configure via UPS
PC Configured
External Batt
Back Select Next
SETUP
Configure via UPS
Configure via UPS
ESC
SMART BPs beyond
SMART BPs beyond
qty 6 must be
qty 6 must be
configured as
configured as
NONSMART.
NONSMART.
Back
Back
Next
Next
SETUP
SETUP
Configure via UPS
ESC
ESC
S+N Pack
0 0 BP48V24-2U
0 0 BP48V60RT-3U
0 0 BP484V24-2US
Back Select Next
SETUP
ESC
Configure via UPS
Configure via UPS
entered.
entered.
Back
Back
Next
Next
SETUP
SETUP
Configure via UPS
ESC
ESC
Press Next to enter
Battery Installed
Date for manually
added battery packs.
Back
Next
SETUP
ESC

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis