Page EN-10
Materials required for assembly
Materials required for assembly
Parts list
(1) Exhaust hood
(2) Upper part of the flue screen
(3) Lower part of the flue screen
(4) Exhaust air operation: Exhaust air hose
(5) Exhaust air operation: Check valve
(6) Wall bracket for upper flue screen
(7) Retaining plate for lower flue screen
(8) 6 plate screws 4.0 × 8 mm
(9) Cable ties
Tools and aids
You will need:
– Screwdriver
– Drill with stone bit (ø 8 mm)
– Measuring tape / ruler
(1)
– Level
– Pencil
– Stable stepladder
– Work gloves
(2)
We also recommend having a second person
with you to help.
(3)
Screws
(4)
The screws and dowels required to
mount the appliance on a wall are not
(5)
included in the package contents as their
type and dimensions will vary depending on
the characteristics of the wall.
(6)
Please have a specialist advise you as to
(7)
which ones you need.
(8)
(9)
In total, you will need
– 2 round-head screws (10) to attach the
wall bracket for the upper flue screen (6)
– 2 round-head screws (11) for hanging the
Exhaust hood.
– 2 round-head screws (12) with flat wash-
ers to secure the Exhaust hood.
– 6 suitable wall plugs
(10)
(11)
(12)