Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting A Radio Receiver; Connecting The Pole Lights (Optional Accessory); Connecting The Led Flashing Light Mod . Xba7 Or Traffic Light To Led Mod . Xba8; Connection Of Other Devices - Nice M3BAR Installierungs-Und Gebrauchsanleitungen Und Hinweise

Automatic barrier
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 107

4.7 - Connecting a radio receiver

The control unit is fitted with a SM type connector for connection of a radio re-
ceiver (optional accessory) model SMXI, SMXIS, OXI or OXIT and similar .
To insert the radio receiver, disconnect the control unit from the power mains
and insert the receiver as shown in fig. 42 .
Table 5 shows the actions performed by the control unit according to the out-
puts activated or the commands sent from the radio receiver .
SMXI, SMXIS, OIX, OXIT receiver in mode I or II
output
description
Output no . 1
Step by step
Output no . 2
Partial Open (opens to approx . 45%;
value programmable with Oview, see paragraph 4 .10 .1)
Output no . 3
Open
Output no . 4
Close
OXI receiver, OXIT programmed in "Extended Mode II"
Command
description
Command no . 1
Step by step
Command no . 2
Partial Open (opens to approx . 45%;
value programmable with Oview, see paragraph 4 .10 .1)
Command no . 3
Open
Command no . 4
Close
Command no . 5
Stop
Command no . 6
Apartment block Step by Step
Command no . 7
Step-Step High priority
(controls also if automation is blocked)
Command no . 8
Unblock + Open
Command no . 9
Unblock + Close
Command no . 10
Open and block automation
Command no . 11
Close and block automation
Command no . 12
Block automation
Command no . 13
Release automation
Command no . 14
Master door Step by Step
Command no . 15
Slave door Step by Step

4.8 - Connecting the pole lights (optional accessory)

01. Move the pole to the vertical position;
02. Unscrew the 6 screws that hold the pole cover (fig. 43);
03. Remove the pole temporarily;
04. Insert the grommet in the pre-drilled hole for cable routing (fig. 44);
05. Route the lights cable through the impact protection rubber profile, using a
guide to facilitate attachment if necessary (fig. 45);
06. If necessary, shorten the length of the lights cable: cuts may only be made
at the points bearing the relative mark . After cutting, the plug at the cut end
must be moved to seal off the new end;
07. Insert the cable first through the hole on the pole support and then through
the hole on the cabinet (fig. 46); Caution – Leave a little extra cable in the
pole support, to enable pole rotation through 90° without tensioning the
cable;
08. Connect the lights cable to the LIGHT terminal on the control unit: see dia-
gram in fig. 47 . Note – The LIGHT output features polarity: if the lights do
not illuminate, as planned, it is necessary to invert the cables connected to
the terminal .
09. Position and secure the connector in the slot on the pole (fig. 48);
10. Insert the pole and secure with its cover, tightening the 6 screws (fig. 49)
fully down and taking care not to pinch the wiring cable .
4.9 - Connecting the led flashing light mod. XBA7 or traffic
light to led mod. XBA8 (optional accessories)
On the cover of the barrier a led flashing light mod . XBA7 or red and green led
traffic light mod . XBA8 may be fitted . The operating modes of these flashing
lights may be modified through the Oview programmer or with suitable pro-
grammes of the control unit . For further information, refer to the instruction
manual for the two products .

4.10 - Connection of other devices

The built-in unit enables the power supply to the
external devices (a radio receiver or the key-operat-
ed selector switch lighting) by receiving power from
the control unit:
for the type of electrical connection,
The power supply volt-
refer to the figure at the side .
age is 24 V
, -30%/+50%, with maximum avail-
able current 100 mA .

4.10.1 - Programming unit Oview

The use of the programming unit Oview enables complete and rapid manage-
8 – English
TABLE 5
24V
(+)
GND (+)
ment of installation, maintenance and troubleshooting of any malfunctions of
the whole automation system . Oview can be connected to the road barrier by
means of the BusT4 connector on the control unit .
To access the BusT4 connector, open the cover of the road barrier and insert
the connector in its seat (fig. 50) .
In general, Oview can be positioned at a maximum distance of 100 m of cable
from the control unit; it can be connected to multiple control units simultane-
ously (max . 16) and can also remain connected during normal operation of the
automation; to exceed these limits, observe the warnings in the Oview instruc-
tion manual and the Oview System Book system manual . If a OXI type radio re-
ceiver is present in the control unit, Oview enables access to the parameters of
the transmitters memorised in this receiver . For detailed information, refer to the
instruction manual of the Oview programmer or the barrier function datasheet
also available on the website www.niceforyou.com .

4.10.2 - Buffer battery mod. PS224 (accessory)

In the event of a mains power failure, the road barrier can also be powered by
a buffer battery model PS224 . To install and connect the battery, proceed as
follows:
Important! – The electric connection of the battery to the control unit
must only be made after completing all installation and programming
phases, as the battery constitutes an emergency power supply.
01. Position the buffer battery as shown in fig. 51-a;
02. Disconnect the mains power and then connect the relative cable of the
buffer battery (fig. 51);
03. Connect the mains power .

4.10.3 - Solemyo System (photovoltaic supply)

The barrier is designed to be powered with the "Solemyo SYKCE" photovoltaic
system . For connection to the control unit, use the 2 pole plug shown in fig. 52 .
IMPORTANT!
- When the barrier is powered by the "Solemyo" system IT MUST NOT
BE POWERED by the electricity grid at the same time.
- Due to the limited solar power available, depending on the installa-
tion location and time of year, the barrier can perform a maximum
number of manoeuvres per day. Before installing the Solemyo sys-
tem, check in the relative instruction manual whether the maximum
number of possible manoeuvres is compatible with the intended use.
- The Solemyo system can only be used efficiently if the control unit is
active and set with the Standby function set to "All" mode (only pos-
sible using the Oview programmer).

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

M5barM7barL9bar

Inhaltsverzeichnis