Herunterladen Inhalt Inhalt Diese Seite drucken

ECG MTD 206 VSS Bedienungsanleitung Seite 60

Mikrowellenherd
Vorschau ausblenden Andere Handbücher für MTD 206 VSS:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Oven installation
Adjustment bolt A:
1) Attach the adjustment bolt to the upper tunnel of the oven and then you can insert the oven into
the cabinet.
2) The height of the gap between the top of the cabinet and adjustment bolt A must be 1 mm.
3) Ensure that that the power cord is not tangles or crimped anywhere.
4) Check that the oven is located in the centre of the cabinet.
Adjustment bolt A
ADJUST SCREW A
Bolt B:
1) Open the oven doors and using bolt B attach the oven to the cabinet at the installation opening
of the frame.
2) Attach the plastic cover to the installation opening.
SCREW B
Bolt B:
3) Connect the oven into standard electrical mains. Make sure that the specifi ed voltage and fre-
quency value specifi ed on the label of the oven conforms with the value of the voltage and fre-
quency in the mains.
If a grounded power socket will not be accessible after the installation of the product, then the
oven must be connected to a bipolar junction socket fi tted with a switch and a fuse with a 3 mm
separation of contacts located in an easy to access location next to the product. The junction
socket must always be accessible, even if the oven is located inside the cabinet.
59
Top tunnel
UPPER AIR TUNNEL
Frame
TRIM-KIT
INSTALLATION HOLE
Installation opening
Set the height
ADJUST HEIGHT
TRIM-KIT PLASTIC COVER
INSTALLATION HOLE
Plastic frame cover
Installation opening
EN
ADJUST SCREW A
Adjustment bolt A
TRIM KIT
Frame

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis