5
Installation
5 1
General notes
This documentation explains the installation of the Ametek
GmbH manual force measuring device.
Tools needed
• Hexagon socket screw set SW10
• Spirit level
• Screwdriver PH1
• Allen key SW2,5, SW3, SW5
Safety
CAUTION
Crush hazard when jaws close
f Always keep the Power pack CPK pack switched off
while installation is in progress.
5 2
Fit the force measuring device with the grip
mount
5 2 1 Set up the base frame and align
3
f Position the base frame
surface.
f To align the base frame, unfasten the hexagon nuts
and turn the device feet
f Check alignment using the spirit level.
f Tighten the hexagon nuts
Assembly Instructions • Force Measurement Device CPK • 04/2018 • v03 • 102-01002
2
on a level and clean work
3
inwards or outwards.
2
.
1
5 2 2 Fitting the manual force measuring device
1
6
5
f By hand, carefully screw the band mount
drawbar
.
6
f Screw the drawbar
unit
.
1
; The band mount
f When fitting MI&T manual force measuring devices,
place the two spacers
f Insert the four screws
base plate
into the manual measuring device
3
f Tighten the manual force measuring device
5 2 3 AT2000 CPK Fitting
1
1
1
f Unfasten the grip mount cover
and remove.
f Insert the AT2000 CPK
Installation
onto the
5
into the manual force measuring
6
is horizontal.
5
onto the base plate
2
from the bottom through the
4
1
on the fixing screw
2
.
1
2
3
4
.
3
.
1
.
2
3
3
8