7
Maintenance
7 1
Important notes
To ensure the safe working order of the AT2000 CPK, it must
be serviced regularly, à Operating instructions of the
AT2000 CPK, Chapter Maintenance
CAUTION
Crush hazard when jaws close
f Do not insert fingers between upper and lower jaws.
f Keep the power pack CPK switched OFF while servicing is
in progress.
7 2
General maintenance activities
The activities involved in maintenance of the AT2000 CPK
and the Power Pack CPK are described in the operating
instructions for the AT2000 CPK, à Operating instructions
for the AT2000 CPK, Chapter Maintenance.
f Check the AT2000 CPK and the accessories regularly for
proper function.
f Dispose of material waste after measurement.
f Check electrical wiring for damage.
f Replace faulty wires immediately.
7 3
Cleaning the force measurement device
f Check the force measurement device CPK regularly for
correct function.
f Clean the force measurement device CPK with a damp
cloth.
Assembly Instructions • Force Measurement Device CPK • 04/2018 • v03 • 102-01002
Maintenance
12