Herunterladen Diese Seite drucken

Physical Installation; Post-Installation; Power Supply - Hach ORBISPHERE 6110 Allgemeines Benutzerhandbuch

Package analyzer v3

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27
Instructions for connecting these gas supplies to the instrument are described in the installation
wizard that will start automatically once power is connected to the instrument for the first time
(refer to

Physical installation

3. Make sure that the A1100 sensor recharge kit (supplied with the instrument) is available. A new
cartridge is included in the kit and must be installed on the sensor prior to first use. Instructions
for cartridge replacement are described in the installation wizard that will start automatically once
power is connected to the instrument for the first time (refer to
Physical installation
1. Connect the instrument to a power source (see
2. Turn the instrument ON. An instrument auto check routine will start automatically. As this is the
first time the instrument will have been powered up, the O2 sensor residual LED will always be
red. This is normal as the system has not yet been fully commissioned and this can be ignored at
this stage.
3. The installation wizard will start automatically. The wizard will take you through the process of
connecting all the gas inputs, filling the antifoam cartridge (refer also to
preparation
on page 21), EC sensor cartridge replacement, antifoam pump maintenance and
the instrument auto-check (refer also to

Post-installation

1. The instrument has been delivered with English as the default language. However, a USB
memory stick is supplied with other available languages (German, Spanish, Chinese, and
Japanese). If you wish to keep English as the preferred language please proceed to the next step
(Step 2 below), otherwise follow these instructions for installing a new language:
• Set the instrument power to OFF.
• Insert the supplied USB memory stick into the USB port on the instrument.
• Set the instrument power to ON.
• Follow the on-screen instructions to install the preferred language.
• Remove the USB memory stick and restart the instrument.
2. Set the security levels, user ID's and passwords as described in
on page 13.
3. Configure the instrument parameters as described in
4. Perform a barometric sensor calibration as described in
on page 16.
5. Perform an O
sensor calibration as described in
2
residual value of the sensor is low enough (controlled automatically by the instrument). This
operation may take around 1-2 hours depending on storage conditions.
Note: The other sensors are more stable and will not require calibration prior to use.

Power supply

A power cable can be ordered with the instrument and this cable must be used to connect the instrument to the
power supply. If no power cable was ordered, please contact your Hach Lange representative for cable
specifications. Inadequately dimensioned power cables must not be used.
Check voltage requirement sticker on the rear panel of the instrument before connecting (100-240 VAC).
on page 7).
Power supply
Instrument auto check
Oxygen sensor
W A R N I N G
C A U T I O N
Physical installation
on page 7).
Antifoam cartridge
on page 8).
Security and user management
Configuration
on page 10.
Barometric pressure sensor
on page 17. Wait until the
on page 7).
English 7

Werbung

loading