Herunterladen Inhalt Inhalt Diese Seite drucken

LR-Cal LPC 200 Bedienungsanleitung Seite 52

Elektronischer druck und temperatur kalibrator
Vorschau ausblenden Andere Handbücher für LPC 200:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MANUAL
LR-
In order to make the electrical connec on for a
together the corresponding cable plug connector to the sensor in line with the orienta on
guide and secure it using a connec on sleeve (screw in the connec on sleeve clockwise
without too much force). To loosen the connec on, the connec on sleeve must be turned
an -clockwise. To disconnect the sensor do not pull the cable, but rather only on the
connector body.
For the connec on to the
together in line with the orienta on guide and secured using the connec on sleeve (screw
in the connec on sleeve without too much force). To loosen the connec on, the connec on
sleeve must be turned an -clockwise. To disconnect the sensor do not pull the cable,
but rather only on the connector body.
4.5 Power supply
The internal Lithium-Ion ba ery, which can be easily charged with the ba ery charger
supplied with the equipment, serves as the power supply for the instrument.
The instrument is delivered with a charge level of 25 ...
once before being used.
The ba ery-level display is shown in the upper right of the screen (see chapter "4.6
Explana on of display and keypad").
When the mains lead/ba ery charger is connected to the
ba ery will be charged, even if the
CAUTION!
The ba ery level during storage or shipping should be between 25 ...
When the ba ery charger is no longer being used, the mains plug should be disconnected
from the mains socket. Do not leave the ba ery charger connected to the rechargeable
ba ery for longer than one day, since overloading can shorten its service life.
Should the rechargeable ba ery s ll not be fully charged a er 24 hours, contact the
manufacturer. When not being used, a fully-charged ba ery will lose its charge over me.
Extreme temperatures have an adverse ef ect on ba ery charging. As a result, the
ba ery may irst need to be either cooled or warmed, as appropriate.
f
Tel. +49 (0) 7121-90920-0 • Fax +49 (0) 7121-90920-99 • DT-Info@Leitenberger.de •
Cal
Cal
LPC 200 +
LR-
calibrator
, the other end of the cable must also be brought
DRUCK & TEMPERATUR Leitenberger GmbH • Bahnhofstr. 33 • D-72138 Kirchentellinsfurt • GERMANY
LPC 200-T
LPC-2
reference pressure sensor, bring
75
% and should be fully charged
instrument
is switched of .
f
52
calibrator
, the
f
75
www.LR-Cal.net
• www.druck-temperatur.de
%.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lpc 200-t

Inhaltsverzeichnis