Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparation - Sanotechnik H90W Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH - EN

Mounting Preparation

1. After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for
shipping damage. If there is any problem, please contact the local seller or our company directly in time. You will get a
satisfactory answer.
2. Necessary tools: drilling machine, stone drill (∅=6mm), crosstip screwdriver, water-level, meter stick, pencil.
3. With structured or imprinted glass make sure that the smooth side of the glass faces the inner side.
4. It is installed each shower cubicle work-page for test purposes, connects, tests and packs again.
5. The douche cup positions and by means of adjustable feet, puts in a way, that no water remains in the douche cup.
RESPECT: necessarily test. Later complaints are impossible.
6. The montage can become implemented only through authoritarian compartment companies (for example plumber),
otherwise the guarantee goes out. see also hint for connection of water and stream,
7. It is the enclosed construction instruction to be paused, as well as all parts must be sealed with sanitary silicone
(silicone denseness test) additionally against each other. All screws, tube clamps, etc. its solidity and denseness is
checked. Something been able to relax through the transportation.
Mounting
3. Arrangle the shower tray (No 13) horizontal .Please install the waste-pipe.
4. Mount the main panel with the screws (No 29) on the shower tray .
5. Connect the back glasswall (No 15)with the main penel (left and right).
6. Mount the sliding wheel (No 9) on the both door and Mount the handles (No 6) on the door.
7. Screw the bend rail down (No 10) and bend rail above on one side with the alu profile (No 2).Connection the
aluminium rail (No 10) with the fixed glass (No 4) and mount the fixed glass in the alu profie . Mount the soft plastic
strips (No 3) behind the alu profile and the fixed glass .Same on the other side.
8. Mount the alu profile (No 2) and back glasswall (No 15) use screws (No 19).Same on the other side.
9. Mount the sliding glass (No 7) in the guide rail.The shower stick with the handshower (No 23)and rosehorse (No 25) .
10. Mount the roof (No 21) on the upper guide rail and the main panel and srew the main panel with the guide rail and
the side back panel.
11. Test if you have fix the srews well and if the door will be close .Make a close control .If it is leaky (based on the size
torerence ) pls give silicone between.
12.
Page 2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis