Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparation; Installation Steps; Electrical Connections - Sanotechnik D920 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Mounting Preparation

1
After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for
shipping damage. If there is any problem, please contact the local seller or our company directly in time. You will get a
satisfactory answer.
2
Necessary tools: drilling machine, stone drill (∅ =6mm), crosstip screwdriver, water-level, meter stick, pencil.
3
With structured or imprinted glass make sure that the smooth side of the glass faces the inner side.
4
It is installed each shower cubicle work-page for test purposes, connects, tests and packs again.
5
The douche cup positions and by means of adjustable feet, puts in a way, that no water remains in the douche cup.
RESPECT: necessarily test. Later complaints are impossible.
6
The montage can become implemented only through authoritarian compartment companies (for example plumber),
otherwise the guarantee goes out. see also hint for connection of water and stream,
7
It is the enclosed construction instruction to be paused, as well as all parts must be sealed with sanitary silicone
(silicone denseness test) additionally against each other. All screws, tube clamps, etc. its solidity and denseness is checked.
Something been able to relax through the transportation.
Mounting

INSTALLATION STEPS

1. Arrange the shower tray (no 11) horizontal. Please instal the waste-pipe.
2. Mount the main panel with the srews (no 14) on the shower tray.
3. Connect the back glasswalls with the main panel (left and right)
4. Srews the bend rails down (no 13) and the bend rail above (no 13) on one side with the alu profile (no 29). Put the down
plastic connection (no 27) and the plastic connection (no 22) on the aluminium rail (no 26) and srew them from the indorr
side. Connect the aluminium rail (no26) with the fixed glass (no 25) and mount the fixed glass (no 25 in the alu prifile (no
29).
Mount the soft plastic strips (no 23) behind the alu pfofile (no 29) and the fixed glass 8no 25) respectively behind
aluminium rail (no 26) and fixed glass (no 25).
Same on the other side.
5. Mount the roof (No 1) on the upper guide rail and the main panel and srew the main panel with the guide rail and the back
fixed glass parts.
6. all srews make fixed
7. Mount the sliding wheel (no 19) on the both doors and put the doors in the guide rail.
8. Mount the handels (no 18) on the doors and the filing (no 29) and the towel rail (no 24), the shower stick with the
handshower and rosehorse (no 28) and the steam outlet ( no 16)
9. Test if you have fix the srews well and if the doors will be close. Make a close control. If it is leaky (based on the size
tolerence) pls give silicone between.

Electrical connections

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis