Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparation - Sanotechnik S500 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Mounting Preparation

1
After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for
shipping damage. If there is any problem, please contact the local seller or our company directly in time. You will get a
satisfactory answer.
2
Necessary tools: drilling machine, stone drill (∅ =6mm), crosstip screwdriver, water-level, meter stick, pencil.
3
With structured or imprinted glass make sure that the smooth side of the glass faces the inner side.
4
It is installed each shower cubicle work-page for test purposes, connects, tests and packs again.
5
The douche cup positions and by means of adjustable feet, puts in a way, that no water remains in the douche cup.
RESPECT: necessarily test. Later complaints are impossible.
6
The montage can become implemented only through authoritarian compartment companies (for example plumber),
otherwise the guarantee goes out. see also hint for connection of water and stream,
7
It is the enclosed construction instruction to be paused, as well as all parts must be sealed with sanitary silicone
(silicone denseness test) additionally against each other. All screws, tube clamps, etc. its solidity and denseness is checked.
Something been able to relax through the transportation.
Mounting
1. Set scales-quite geared up the shower tray (7), Install the drain pipe.
2. You connect the fixed left or right function profile (4 or 20) and the side panel (3 or 22),You use screws (M6×20) for
it .and then you connect the fixed left or right side panel (3 or 22) and middle panel
3,22,24 mounting on the shower tray (7) use (M6×20) finally.
3. Scrws the bend rail down (8) and bend rail above (8) on one side with the alu profile (10).Connection the aluminium rail
(8) with the fixed glass (12) and mount the fixed glass (12) in the alu profie (10). Mount the soft plastic strips (11) behind
the alu profile (10) and the fixed glass (12) .Same on the other side.
4. Mount the alu profile (10) and (4) use screws (5 ).Same on the other side.
5. Mount the sliding wheel (S16) on the both door and put the door in the guide rail.
6. Mount the handles (13) on the door .the shower stick with the handshower and rosehorse (21) and the steam outlet
7. Mount the roof (1) on the upper guide rail and the main panel and srew the main panel with the guide rail and the side
back panel.
8. Test if you have fix the srews well and if the door will be close .Make a close control .If it is leaky (based on the size
torerence ) pls give silicone between.
Page 2
(24),using screws (M6×20) for it.

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis