Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparation - Sanotechnik SM500 Montageanleitung

Inhaltsverzeichnis

Werbung

Mounting Preparation

1
After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for
shipping damage. If there is any problem, please contact the local seller or our company directly in time. You will get a
satisfactory answer.
2
Necessary tools: drilling machine, stone drill (∅ =6mm), crosstip screwdriver, water-level, meter stick, pencil.
3
With structured or imprinted glass make sure that the smooth side of the glass faces the inner side.
4
It is installed each shower cubicle work-page for test purposes, connects, tests and packs again.
5
The douche cup positions and by means of adjustable feet, puts in a way, that no water remains in the douche cup.
RESPECT: necessarily test. Later complaints are impossible.
6
The montage can become implemented only through authoritarian compartment companies (for example plumber),
otherwise the guarantee goes out. see also hint for connection of water and stream,
7
It is the enclosed construction instruction to be paused, as well as all parts must be sealed with sanitary silicone
(silicone denseness test) additionally against each other. All screws, tube clamps, etc. its solidity and denseness is checked.
Something been able to relax through the transportation.
Mounting
See by the german language (DEUTSCH)
Page 2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis