Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Preparation - Sanotechnik TR101 Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Mounting Preparation

1
After opening the case, read this introduction carefully, check all the packed parts, examine the shower cabinet for
shipping damage. If there is any problem, please contact the local seller or our company directly in time. You will get a
satisfactory answer.
2
Necessary tools: drilling machine, stone drill (∅ =6mm), crosstip screwdriver, water-level, meter stick, pencil.
3
With structured or imprinted glass make sure that the smooth side of the glass faces the inner side.
4
It is installed each shower cubicle work-page for test purposes, connects, tests and packs again.
5
The douche cup positions and by means of adjustable feet, puts in a way, that no water remains in the douche cup.
RESPECT: necessarily test. Later complaints are impossible.
6
The montage can become implemented only through authoritarian compartment companies (for example plumber),
otherwise the guarantee goes out. see also hint for connection of water and stream,
7
It is the enclosed construction instruction to be paused, as well as all parts must be sealed with sanitary silicone
(silicone denseness test) additionally against each other. All screws, tube clamps, etc. its solidity and denseness is checked.
Something been able to relax through the transportation.
Mounting
1. Set scales-quite geared up the shower tray (14),Install the drain pipe.
2. Connect the middle panel (19) with the side panel (3 and 20) , with the screws M4*25 and put the parts on the
shower tray.
3. Screw the bend rails (13) on bouth sides on the Fixed profile (9), put the aluminium border (9,13) onto the
shower tray and fix the border with the panels (3 and 20).
Juse the screws ST3.5*13.
Fix the side panels (3,20) on the shower tray with the screws M4*25.
4. Put the fix glass parts into the aluminium border (9,13). You fix the glass parts by fixing the aluminium rail (10)
with the aluminium border (9,13) with screws.
Juse the screws ST3.5*13.
Put the ''T" gasket (8) between fix glass parts and aluminium rails.
5. Mount the sliding wheels (17) only on the upper side on bouth glassdoors (5) and hang them into the bend
rails. After this you can mount the sliding wheels on the lower side of the glassdoors. Put the magnetic strip
(26) and the anti-water plastic strip (6) on bouth glassdoors.
6. Mount the handels (12) on the doors, the shower bar, hand shower, the shower hose, the foot massage, the
shelve and the steam outlet on the side panels (3,20).
7. Fix the roof (1) with the sidepanels (3,20) , juse the screws M4*25. Mount the electronic and the
steamgenerator on the back side of the middle panel (19). Connect the electronic/steam generator correct.
8. Test if you have fix the srews well and if the door will be close .Make a close control .If it is leaky. pls give
silicone between.
Page 2

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Tr202Tr303

Inhaltsverzeichnis