Herunterladen Inhalt Inhalt Diese Seite drucken

Technical Data Super Finish 27 And 31; Transport; Starting Operation; Unit With Suction System - WAGNER Super Finish 31 Betriebsanleitung

Airless hochdruck-spritzgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Description of unit
3.4 Technical data
Voltage
Fuse protection
Voltage on multifunction
switch
Unit connection line
Socket on unit
Max. connection
Type of protection
Capacity
Max. operating pressure
Max. volume flow
Volume flow at 120 bar
(12 MPa) with water
Max. size of tip
Max. temperature of
the coating material
Max. viscosity
Net weight
Hydraulic filling quanitity
Max. tyre pressure
Max. acoustic pressure level :
* Place of measuring: 1 m in distance from the unit and
1.6 m above the floor, 120 bar (12 MPa) operating
pressure, reverberant floor

3.5 Transport

Push or pull unit.
Loosen terminal sleeves (fig. 5, item 1) on the shaft (L
open). Extract shaft to the desired length.
Tighten terminal sleeves again by hand (R closed).
1
30
Super Finish
Super Finish
27
31
:
230 Volt~, 50 Hz
220 Volt~, 60 Hz
:
16 A slow-blow
:
24 V
:
6 m long, 3 x 1.5 mm
:
230 Volt ~, 50 Hz
220 Volt~, 60 Hz
:
1000 Watt
: IP 44
IP 54
: 1.5 kW
1.7 kW
:
250 bar (25 MPa)
: 3.0 l/min
3.5 l/min
3.5 l/min
(220 Volt~, 60 Hz)
: 2.5 l/min
3.2 l/min
3.1 l/min
(220 Volt~, 60 Hz)
: 0.027 inch
0.031 inch
– 0.69 mm
– 0.79 mm
:
43°C
:
25.000 mPa·s
: 40 kg
43 kg
:
0.9 Litre
ESSO NUTO H 22
:
2 bar (0.2 MPa)
74 dB (A)*
g
Transport in vehicle
Unroll high-pressure hose and lay it over the shaft.
Secure the unit by means of suitable fastening.

4. Starting operation

4.1 Unit with suction system

2
1.
Screw off dust protection cap (fig. 6, item 1).
2.
Pay attention to clean sealing areas on the
connections.
Pay attention to the fact that the red inlet (2) is in-
serted into the coating material inlet.
3.
Screw and tighten the union nut (3) on the suction
pipe (4) onto the coating material inlet (5) with the
accompanying spanner 41 mm.
4.
Screw the union nut (6) on the return pipe (7) onto
the connection (8).

4.2 Unit with upper hopper (5 litres)

1.
Screw off dust protection cap (fig. 7, item 1).
2.
Pay attention to clean sealing areas on the
connections.
Pay attention to the fact that the red inlet (2) is in-
serted into the coating material inlet.
3.
Screw the upper hopper (3) onto the coating ma-
terial inlet (4).
4.
Hang the return pipe (5) into the upper hopper.
5.
Screw the union nut (6) on the return pipe (5) onto
the connection (7).
Starting operation
5
2
3
1 8
6
4
7
Super Finish 27 • 31

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Super finish 27

Inhaltsverzeichnis