4. Initial operation

4.1 Power supply to analyser box
Mains adapter :
Attach mains adapter to the analyser box
testo rechargeable battery pack (0515 0098)
.
1 Unlock catch
2 Connect adapter. Ensure that the plug snaps into place
Observe markings on adapter.
Do not kink or damage cable!
3 Replace cover and close.
Recharging the rechargeable battery pack
Recharge rechargeable battery pack prior to first use.
It is not possible to recharge during operation.
· The instrument must be switched off.
· The rechargeable battery pack must be inserted in the logger for recharging.
Insert mains cable (230 V AC) into analyser box.
· Recharging the analyser box:
·
Recharging is in progress: LED flashes green,
·
Recharging is complete: LED lights up green.
An empty rechargeable battery needs up to approx. 3-4 hours for complete recharging.
4.2 Power supply to Control Unit
Mains unit (0554 1084):
Connect mains unit to Control Unit
Batteries/Standard rechargeable batteries:
.
1 Release lock
2 Insert batteries. Watch out for +/-
3 Replace cover and close.
The batteries can remain inside the instrument during mains operation.
Recharging is not possible with batteries/standard rechargeable batteries.
testo rechargeable battery pack (0515 0097):
.
1 Release lock
.
2 Insert plug
Observe markings on plug.
Do not kink or damage cable!
3 Insert the rechargeable battery pack such that the rechargeable battery pack label is
visible from above
.
4 Replace cover and close.
.
.
.
.
4. Initial operation 29