Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Initial Inspection-Equipment Provider; Routine Maintenance-Patient; Equipment Provider - DeVilbiss SleepCube Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für SleepCube:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Maintenance

A. Initial Inspection—Equipment Provider
DeVilbiss recommends equipment inspection upon delivery
❏ Power up the DV54/DV53 PAP using AC power.
❏ Test pressure accuracy using an outlet cap (DV54/
DV53D-620), a calibrated pressure gauge and the proce-
dures listed under Pressure Accuracy Test.
❏ Test the keys on the keypad using the procedures listed
under Keypad Test.
B. Routine Maintenance—Patient
❏ Wipe case with damp cloth every few days
❏ Check air-inlet fi lter every 10 days and clean as needed
❏ Clean air supply tubing daily
❏ Clean mask and headgear per manufacturer's instructions.
C. Required three years Maintenance—

Equipment Provider

DeVilbiss requires the following maintenance from the equip-
ment provider:
❏ Test pressure accuracy using procedures listed under Pres-
sure Accuracy Test. If the device is out of calibration, follow
corrective procedures as listed.
❏ Instruct patient on fi lter maintenance described in Instruc-
tion Guide:
Standard Filter
o Inspect fi lter every ten days
o Clean as needed
o Change every 6 months
Optional Fine Particle Filter
o Inspect fi lter every ten days
o Replace if dirty
o Change every 30 days
EN
9
LT-2026

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Dv53Dv54Dv54-p

Inhaltsverzeichnis