Herunterladen Inhalt Inhalt Diese Seite drucken

Schleifer Tauschen Bei Wechselstrom-Ausführung Ac (Fig. 4); Premium-Digitaldecoder Tauschen (Fig. 4); Removing The Motor, Maintenance Work On The Wheel Sets, Gearing And Coupling Norm Shaft; Exchanging The Sliding Contact Of The Alternating Current Version - BRAWA BR 312 Betriebsanleitung

Inhaltsverzeichnis

Werbung

4. Removing the motor, maintenance work
on the wheel sets, gearing and coupling
norm shaft (Fig. 4)
Replacing the engine:
Remove body and board – see (2) and (3). Loosen the screws
(07) of the gear cover (08). Remove the gear cover. Remove
the engine (09) upwards.
Maintenance work on the wheel sets, gears and coupling norm
shaft:
Turn the locomotive over, so that wheels and coupling plate are
facing upwards. With models with alternating current, loosen
the screw (10) of the sliding contact (11) and remove the sliding
contact. Unscrew the screws (12), raise the coupling cover (13)
together with the wheel sets (19). Unscrew the hexagon screws
(14) on the wheel sets and the weight (15) and remove the driving
rod (16). In order to reach the upper coupling, the body, engine
and coupling cover have to be taken apart (see (2) and (4)).
5. Schleifer tauschen bei Wechselstrom-
Ausführung AC (Fig. 4)
Befestigungsschraube (10) herausdrehen, Schleifer (11)
abnehmen.
5. Exchanging the sliding contact of the
alternating current version AC (Fig. 4)
Unscrew the fastening screw (10). Remove the sliding contact
(11).

6. Premium-Digitaldecoder tauschen (Fig. 4)

Gehäuse demontieren, siehe Punkt 2.
Premium-Digitaldecoder (17) abziehen und neuen einstecken.
6. Excanging the premium digital decoder
(Fig. 4)
Dismantle the body, see (2).
Take out the premium digital decoder (17) and insert a new
one.
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis