Herunterladen Inhalt Inhalt Diese Seite drucken

Ups Startup - Eaton Axxium Pro 9910 Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27
Installation

UPS Startup

8
Models B43 and B47
3-wire (one hot, a neutral, and a ground), 220V, 230V or 240V
input circuit. See Table 5 for circuit breaker sizing.
The input circuit is hardwired into the input terminal block of
the system (see Figure 5).
Figure 5. Models B43 and B47 Input Wiring
NOTE For additional information regarding installation, local grounding electrode, and
Remote Emergency Power-Off (REPO) switches refer to SECTION 1100, "Installation
Planning" in the Axxium Pro User / Installation Manual .
1. Verify that the AS/400 and other equipment to be protected by
the UPS is powered off.
2. The UPS front panel display automatically turns on whenever
input power is present. Set up the initial operating parameters
through the front panel (press the Enter button after each
selection):
Enter the correct security password (0377) using the arrow
S
keys.
Select the desired language for the display (English, French,
S
German, or Spanish).
Set the correct date and time.
S
Select the correct output voltage (200, 208, 220, 230, or
S
240 Vac).
To keep the UPS password-protected, set the Password
S
function to ON. To disable the Password function, select OFF .
The ON/OFF function screen is displayed on the front panel.
Axxium
Pro 9910 Installation Guide for IBM Applications
t
. Requires the installation of a single-phase,
L1
L2/N
GND
LTM-1341 A Uncontrolled Copy
S

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis