Herunterladen Diese Seite drucken

Scheppach 5906120901 Originalbetriebsanleitung Seite 28

Vorschau anzeigen Andere Handbücher für 5906120901:
Verfügbare Sprachen

Verfügbare Sprachen

  • DEUTSCH, seite 1
m Warning: Noise can have serious effects on your
health. If the machine noise exceeds 85 dB, please
wear suitable hearing protection.
Sound power level L
wA
Sound pressure level L
pA
Uncertainty K
wA/pA
7.
Before commissioning
• Before connecting, make certain that the data on the
type plate matches with the mains power data.
• Prior to initial commissioning, remove the transport
plug (B) and fill the compressor pump housing with
oil as described in item 8.4.
• Check the device for transport damage. Immediate-
ly report any damage to the transport company that
delivered the compressor.
• Install the compressor near the point of consump-
tion.
• Long air lines and supply cables (extension cable)
should be avoided.
• Ensure that the intake air is dry and dust-free.
• Do not deploy the compressor in damp or wet areas.
• Operate the compressor only in suitable areas (well
ventilated, ambient temperature +5°C to 40°C).
There must be no dust, acids, vapours, explosive
gases or inflammable gases in the room.
• The compressor is designed to be used in dry
rooms. It must not be used in areas where splashed
water is present.
• The oil level in the compressor pump must be
checked before commissioning.
• The compressor may only be used outdoor briefly
when the ambient conditions are dry.
• The compressor must always be kept dry and must
not be left outdoors after work is complete.
8. Assembly and operation
m ATTENTION!
Always make sure the product is fully assembled
before commissioning!
You require the following for assembly:
• 2 x open-ended spanner 19 mm (not included in the
scope of delivery)
• 2 x open-ended spanner 14 mm (not included in the
scope of delivery)
28 | GB
8.1
Fitting the wheels (fig. 5)
• Fit the wheels (11) provided as shown.
8.2
Mounting the foot (2x) (Fig. 6)
96 dB
• Fit the foot (2x) provided as shown in.
71 dB
8.3
Installing the air filter (2x) (Fig. 7, 8)
2.03 dB
• Remove the transport plug (A) and screw the air
filter (14) to the device.
8.4
Replacing the transport lid (B) (Fig. 9, 10)
• Remove the transport cap (B) of the oil filling open-
ing (18).
• Fill the compressor oil supplied into the compressor
pump housing and fit the enclosed oil plug (15) into
the oil filling opening (18).
8.5
Mains power connection
• The compressor is equipped with a mains cable with
an earthed plug. This can be connected to any 230
V~ 50 Hz protective contact socket, with fuse pro-
tection of at least 16 A.
• Before commissioning, ensure that the mains volt-
age matches with the operating voltage and the ma-
chine's power rating on the type plate.
• Long supply lines, as well as extensions, cable
drums etc. cause voltage drop and can prevent the
motor from starting.
• At low temperatures below +5 °C, sluggishness may
make starting difficult or impossible.
8.6
On/Off switch (Fig. 2)
• Pull the On/off switch (16) upwards to switch on
the compressor. Press the ON/OFF switch down
to switch off.
8.7
Adjusting the pressure: (Fig. 1, 3)
• The pressure at the manometer (4) is adjusted with
the pressure regulator (5).
• The pressure set can be drawn from the quick cou-
pling (3).
• The vessel pressure can be read off at the pres-
sure gauge (6).
• The vessel pressure is taken at the quick-coupling (7).
8.8
Setting the pressure switch (fig. 1)
• The pressure switch (2) is set at the factory.
Cut-in pressure approx. 6 bar
Cut-out pressure approx. 8 bar
www.scheppach.com
loading

Diese Anleitung auch für:

59061209035806105901Hc100dc