Herunterladen Diese Seite drucken

ELL Solid RG10A/BGEF Bedienungsanleitung Seite 27

Verfügbare Sprachen

Verfügbare Sprachen

Install You Indoor Unit
1
Select installation location
NOTE
Panel installation should be performed after piping and wiring have been completed.
Proper installation locations meet the following standards:
Enough room exists for installation
and maintenance.
The air inlet and outlet are
not blocked.
DO NOT install unit in the following locations:
Areas with oil drilling or fracking
Areas with caustic gases in the
hot springs
Areas that experience power fluctuations, such
as factories
Recommended distances between the indoor unit
The distance between the
mounted indoor unit should
meet the specifications
illlustrated in the
following diagram.
Enough room exists for the connecting the
pipe and drainpipe.
The airflow can fill the
entire room.
air, such as
150mm
The wall must be able to support the weight of the
indoor unit.
Enclosed spaces, such as cabinets
Kitchens that use natural gas
Areas with strong electromagnetic waves
Areas that store flammable materials or gas
≥100mm
794mm
150mm
26
There is no direct radiation from
heaters.
200mm
≥1000mm
loading

Verwandte Produkte für ELL Solid RG10A/BGEF

Diese Anleitung auch für:

Solid rg10ab2s/bgef