Herunterladen Inhalt Inhalt Diese Seite drucken

Specialist Installer Qualifications; Rv 2 Ventilation System - Maico Rv 2 Vh Montageanleitung

Vormontage-set
Vorschau ausblenden Andere Handbücher für RV 2 VH:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

3 Specialist installer qualifications

3 Specialist installer qualifications
Installation may only be carried out by specialists
who have the necessary knowledge and experi-
ence in ventilation technology.
Electrical connection, commissioning, mainten-
ance and repairs may only be carried out by qual-
ified electricians in accordance with DGUV reg-
ulation 3, Section 2 (3) and in compliance with the
relevant standards (e.g. DIN EN 50110-1) and
technical rules.
Further provisions of other national laws must
be taken into account.
Qualifications and requirements needed for in-
stallation work: Specialist training and knowledge
of compulsory technical standards, EU Directives
and EU Ordinances. The installations must be
carried out professionally. Applicable building reg-
ulations, accident prevention regulations, occupa-
tional health and safety measures (protective
22
clothing in good repair etc.) must be complied
with. Installation work by trainees is only permit-
ted under the supervision of the above-mentioned
trained specialists.
The persons must be instructed in health and
safety requirements for their area. A school-leav-
ing certificate with good national language skills is
required.
4 RV 2 ventilation system
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rv 2 vvRv 2 vllRv 2 vlr

Inhaltsverzeichnis