Herunterladen Inhalt Inhalt Diese Seite drucken

Maico RV 2 VH Montageanleitung Seite 31

Vormontage-set
Vorschau ausblenden Andere Handbücher für RV 2 VH:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

12 Installation of the parapet wall for RV 2 VH
2. Insert the mounting sleeve flush with the exter-
ior wall and exactly horizontally (projecting
length for external plaster frame 18 mm). Ob-
serve a 0° inclination. Ensure that the inclina-
tion is precisely balanced in all directions and
check with a spirit level. Note the symbols on
the mounting sleeve: top, bottom, inside,
outside and the position of the spirit level.
Interior wall
3. Check the position of the mounting sleeve on
the exterior wall with the rod level. Rework if
necessary. Observe the distance for the re-
quired minimum plaster thickness "X".
Exterior wall
4. Weigh down the mounting sleeve until the
mounting foam has hardened.
ATTENTION: Damage to the mounting sleeve if
weighted down at certain points. Only weigh
down the mounting sleeve over the entire width
and the walls. Point loading is not permitted out-
side the walls.
Interior wall
5. Brick up the parapet to the same height as the
mounting sleeve and glue/foam the mounting
sleeve to the side.
Interior wall
6. Fit the inner plaster frame: Adjust the frame to
the actual masonry thickness and required
minimum plaster thickness. To do this, loosen
the 4 screws, pull out the frame, place it un-
derneath and screw it back on. The frame can
be pulled out up to 15 mm. ATTENTION:
Avoid overtightening the screws at all costs.
31
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rv 2 vvRv 2 vllRv 2 vlr

Inhaltsverzeichnis