Herunterladen Inhalt Inhalt Diese Seite drucken

Safety Instructions; Security Instructions - Kessel SonicControl Anleitung Für Einbau, Bedienung Und Wartung

Fettschichtdickenmessgerät
Vorschau ausblenden Andere Handbücher für SonicControl:
Inhaltsverzeichnis

Werbung

Dear customer,
Before you put your KESSEL SonicControl into operation, plea-
se read through the installation instructions carefully and fol-
low them.
Check first whether the system has arrived undamaged.

1. Safety instructions:

During installation, operation, maintenance or repair of the system,
the regulations for the prevention of accidents, the pertinent DIN
and VDE standards and directives, as well as the directives of the
local power supply industry must be heeded.
Before putting the device into operation, make sure through pro-
fessional examination that the necessary protective features are
available. Grounding, neutral, residual current-operated protective
circuit etc. must correspond to the requirements/specifications of
the local power supply industry.
The system must not be operated in potentially explosive areas.
The system contains electric charges. Non-compliance with the

1. Security Instructions

operating instructions may result in considerable damage to pro-
perty, personal injuries or even fatal accidents.
It must be ensured that the electric cables as well as all other
electrical system equipment are in a faultless condition. In case of
damage, the system may on no account be put into operation or
must be stopped immediately.
The regulations set out by the directive VDE 0100 must be
heeded. The switch unit must not be installed in rooms where there
is an explosion hazard.
The system must be inspected and serviced regularly to maintain
its operational ability.
We recommend that you conclude a servicing contract with your
installation company.
The system must be disconnected from the mains before
any work is carried out on it.
36

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis