4 Scope of delivery

clothing in good repair etc.) must be complied
with. Installation work by trainees is only permit-
ted under the supervision of the above-mentioned
trained specialists.
The persons must be instructed in health and
safety requirements for their area. A school-leav-
ing certificate with good national language skills is
required.
4 Scope of delivery
Packaging unit 1: RV 2 VS
• Mounting sleeve of the pre-installation kit for
renovation work, length 500 mm, with red
plaster primer, can be shortened to 365 mm
• Internal plaster frame (supplied loose), 4
screws fixed to mounting sleeve
• Internal plaster protective cover, inserted in
the internal plaster frame
• These installation instructions in the pack-
aging unit Pre-installation kit for renovation
work
• Supplementary safety instructions for Push-
Pull ventilation units
Packaging unit 2: RV 2 VS 90E
• 90° deflection unit for renovation work,
length 450 mm, can be shortened to 220 mm,
incl. adapter, permanently bonded
• Mounting brackets, 4 pieces
• Adhesive tape, 1 m
• Stainless steel external cover complete, with
stainless steel support and drip edge + 4
screws, stainless steel external grille + 2 screws
16

5 Intended use

RV 2 ventilation units with heat recovery are used
for controlled ventilation and air extraction of indi-
vidual rooms with ventilation capacities of up to
42 m³/h.
The ventilation units are suitable for flats, single
and multiple-family dwellings, offices or compar-
able rooms, both for new builds and renovation
work.
The RV 2 ventilation unit is intended exclusively
for domestic use or applications similar to do-
mestic use. Any other or additional use shall be
deemed improper.

6 Building regulations

Local building regulations and building regulations
of the federal states: In Germany and the EU,
there are no standardised regulations for the
planning and execution of building and under-
ground construction. The European standards
and other requirements apply, which may vary
from state to state in Germany. Planners and
users must observe the information in these in-
stallation instructions and the locally applicable
building regulations.
In Germany, please observe the building regula-
tions of the federal states (based on the Model
Building Code [MBO]) and the technical building
regulations of the federal states (based on the
Model Administrative Provisions – Technical
Building Rules [MVV TB]).
Outside Germany, the relevant country-specific
regulations must be observed during planning
and application.