Herunterladen Diese Seite drucken

RIESE & MÜLLER VBK0259 Montageanleitung Seite 5

Frontgepäckträger

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ENGLISH: Assembly Instruction Dealer
Cruiser/Swing FRONT CARRIER (VBK0259)
5.
Insert fork clamping piece
6.
Attach front carrier with short clamping piece and shim loosely (pre-assembled) to light
bracket with screw
ATTENTION:
The connection between front carrier and light bracket (fig. 5) is
fig. 4: carrier bracket at steerer
7.
Flip basket up and attach it to carrier bracket
8.
Align carrier, align long clamping pieces
pieces and light bracket). Tightening torque 4Nm.
9.
Mount stem and adjust the front fork play.
10. Fasten the carrier bracket with fasteners
(fig. 3 and fig. 4).
11. Attach front light with screw M6x45, plastic spacer, washer and nut M6 (fig. 7).
12. Fix light cable and front brake hose with zip ties.
13. Functional check: turn handlebar to the left and to the right.
Cables and brake hoses shall not stretched or kinked.
fig. 6: carrier alignment
Riese & Müller GmbH | Am Alten Graben 2 | D-64367 Mühltal | Tel.: 06151-366 86-0 | Fax: 06151-366 86-489 | E-Mail: team@r-m.de | Internet: www.r-m.de
and place carrier bracket on steerer (fig. 4).
(fig. 5).
fig. 5: carrier at light bracket
on the same level and tighten all bolts (clamping
,
fig. 7: Front light
with both long clamping pieces
and
. Tightening torque 4 Nm
(fig. 6).
Seite 5 of 6

Werbung

loading