Layher ZIFA Aufbau- Und Verwendungsanleitung Seite 51

Vorschau ausblenden Andere Handbücher für ZIFA:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

2. Fasten a diagonal brace
20
tower and to the second rung from below of the second basic tower.
3. Snap in the access deck
24
at the second cross-rung from below of
the upper basic tower.
4. Open the third basic tower
folding part. Attach it at an angle of 180° to the second basic tower.
Secure the joints with spring clips 15.
5. Fasten a diagonal brace
19
to the bottom rung of the second basic
tower and to the second rung from below of the third basic tower.
Install the diagonal brace opposite to the first diagonal brace.
6. To complete the working platform, install 3 guardrails 16, toe boards
25
and end toe boards 26.
to the bottom rung of the first basic
9
and firmly snap in the joint in the
Further assembly
Tower model 625
1. Open the second basic tower
folding part. Attach it at an angle of 180° to the first basic tower.
Secure the joints with spring clips 15.
9
and firmly snap in the joint in the
19